Attached link below:
http://www.statecollege.com/news/lo...million-in-branding-upgrades-planned,1462092/
Recent commit Quinn Nordin alluded to the new 12 million dollar blender room up grade, Lol... but I wanted to re-look at the 12 million dollars that was allocated to improve the Lasch building and the Beaver Stadium Press Box.
Attached is an article where James Franklin speaks about his vision and architectural concept drawings are included to show the improvements to the Lasch Building. The project is slated to be finished in June of 2016 and I wanted to review the concept to finished results progress.
Make sure to look at the architectural rendering drawings at the bottom of the article.
http://www.statecollege.com/news/lo...million-in-branding-upgrades-planned,1462092/
Recent commit Quinn Nordin alluded to the new 12 million dollar blender room up grade, Lol... but I wanted to re-look at the 12 million dollars that was allocated to improve the Lasch building and the Beaver Stadium Press Box.
Attached is an article where James Franklin speaks about his vision and architectural concept drawings are included to show the improvements to the Lasch Building. The project is slated to be finished in June of 2016 and I wanted to review the concept to finished results progress.
Make sure to look at the architectural rendering drawings at the bottom of the article.
Last edited: