I had posted earlier that structural engineers had evaluated the current Buffalo stadium and determined that it needed a BILLION dollars in repairs so they are building a new stadium
across the street at a figure of 1.4 billion. However, new stadium has considerably LESS seats (60 thousand vs 72 thousand) which is a pretty sizeable reduction at a huge price.
Whatever happens to Beaver stadium will most likely not be for a few years but I personally would hate to see seat capacity significantly reduced- a drawing card to PSU I think
is bigger size- how much do we use 107K strong in our tweets! Who pays for the stadium is not determined as the Pegula's do not want to pay the total price!
across the street at a figure of 1.4 billion. However, new stadium has considerably LESS seats (60 thousand vs 72 thousand) which is a pretty sizeable reduction at a huge price.
Whatever happens to Beaver stadium will most likely not be for a few years but I personally would hate to see seat capacity significantly reduced- a drawing card to PSU I think
is bigger size- how much do we use 107K strong in our tweets! Who pays for the stadium is not determined as the Pegula's do not want to pay the total price!